What the lesson covers
A firm's costs split into fixed costs, which stay the same whatever it makes, and variable costs, which grow with output. Students slide along a total cost line, watch average cost fall and work out the cost of a loaf.
The slides, one by one
Every slide is built click by click: text, formulas and pictures come in one step at a time, so the class follows the reasoning instead of reading ahead. Graphs with sliders can be dragged live while you present.
Questions teachers ask
What is the difference between fixed and variable costs?
Fixed costs, such as rent, do not change with output in the short run. Variable costs, such as materials, rise with each unit made. Total cost = fixed cost + variable cost, and average cost = total cost ÷ quantity.
Are these slides really free?
Yes. Watch them on this page or present them full screen with no account. Making your own copy to edit is free too.
Can I change the slides before my lesson?
Yes. Press "Make my own copy" and the deck becomes one of your projects in the Tracé editor, where you can change the text, the numbers, the colours or the order of the clicks.
Do they work on a classroom projector or an interactive whiteboard?
Yes. They run in the browser on any laptop, so anything that shows your screen works. Press the right arrow or click to go to the next step.





